27. When all Walls and Top Plates are attached
together, check wall and floor alignment. Bottom
wall framing should sit flush with outside of floor
joists. See Steps 15-20 for correct alignment.
Confirm Door Jambs are 64” apart at top and
bottom of door opening.
When positioned correctly, fasten bottom wall
plates to floor using 4 - 2 1/2” screws per wall
panel.
Bottom Wall
Framing
Confirm 64” Wide between Door Jambs
Caulking
Optional - Caulking
seams will help prevent
moisture from entering at
seam.
Caulking not included in
kit.
26. Complete remaining Side and Rear Top Plate
attachments as per Steps 24-25.
1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 13
Angle
screws into perimeter
Floor Joists.
Comments to this Manuals