Outdoor Living Today MAX66 Use and Care Manual Page 5

  • Download
  • Add to my manuals
  • Print
  • Page
    / 29
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 4
3. Lay out both completed Floor Joist
Frames as illustrated at left.
2. When correctly positioned, attach each Joist with 4 - 2 1/2” screws (2 per end). Complete Joist
attachments for 2nd Floor Frame.
4. Align Floor Joist Frames together as shown below. Screw Sections
together with 8 - 2 1/2” screws.
5. When completed, your floor footprint
should be 70” wide x 75” deep.
1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 5
You can find the
Square Drive Bit for
the screws in with
the Hardware Kit
Bag.
Page view 4
1 2 3 4 5 6 7 8 9 10 ... 28 29

Comments to this Manuals

No comments