6x6 Maximizer Storage ShedAssembly ManualVersion #5April 13, 2012Thank you for purchasinga 6x6 Maximizer Storage Shed. Please take the time to identif
19. Align wall panel framing flush with floor framing and attach vertical wall studs together asper Step 18.20. Position and attach remaining side wal
23. Position and attach the Door Header flush to outside end of Door Jamb with 2 - 2 1/2” screws perside. Important- Drill 1/8” pilot holes in end of
25. Position a Front Top Plate(angle cut on edge) on to top of wallframing. Butt the straight cut end up toSide Top Plate and align flush with theins
27. When all Walls and Top Plates are attachedtogether, check wall and floor alignment. Bottomwall framing should sit flush with outside of floorjoist
29. Temporarily attach Gable to walls and top plate with 2 - 2” screws. Screw from the bottom ofgable framing down into Top Plate and Wall. Gables may
C. Rafter and Roof SectionPlywoodRoof Panels(2)78” x 32 1/4”Exploded view of all parts necessary to complete the Roof Section.Identify all parts prior
32. Attach Ridge Board to ends of both outside rafters with 2 - 2”screws per end. Drill 1/8” pilot holes in Ridge Board to prevent splitting.Measure a
35. Starting at the rear, lift a completedrafter section up and place on gable framing. Soffit37. When Rafter Section is correctlypositioned, outside
38. Place 2nd completed Rafter Section on gable wall framing. Position as per Steps 34 - 36.40. With both Ridge Boards connected, completely secure Ga
42. The Roof Gusset is positioned on center rafter. When correct, slide gusset up, use level tosquare gusset and attach to rafter with 4 - 1 1/4” sc
Parts List:A. Floor Section 2 - 35” x 75” - Floor Joist Frames 2 - 1/2” x 35” x 75” - Plywood Floor 4 - 1 1/2” x 3 1/2” x 72” - Floor Joists3 - 1 1/2”
44. When Plywood is correctly positioned, fasten down into Roof Rafters with 10 - 1 1/4” screws.Locate 78” x 13” Plywood Roof Piece and position as i
D. Miscellaneous SectionFront andRear Facia(2)HorizontalGable Trim(4)Narrow Trims Side Wall (2)PentagonFacia Piece(2)Note - missing from exploded draw
50. Attach Rear FillerTrim (3/4” x 2 1/2” x 75”) torear walls in each corner.Hammer with 6 - 1 1/4” finishing nails. Strips arepositioned flush with s
Side Front Wide Trim53. Position and attach SideFront Wide Trims and NarrowTrims (Sides). Use 8 - 1 1/4”nails per piece to secure.52. Attach Narrow T
55. Locate Side Facia (angle cut on both ends). There are 2 left and 2 right side pieces. Correctpositioning is rough side out. Starting on one side,
59. Next, position and secure the Double Doors. Starting with Left Side Door, position so there is a1/2” gap on bottom and approximately 3/8” on the s
Bottom of Door3/8” onside.1/2” gapat bottom.61. Position and attach Right Side Door as per Steps 59-60. Door position may need slight adjusting to ope
64. Close both doors and align sodoors are straight. Attach DoorThreshold (2 1/2” wide x 62 1/2” long)with 4 - 2” screws centering betweendoorway. 63.
66. The Interior Cane Bolt will be attached to VerticalDoor Flange. To position Cane Bolt correctly, attach toflange first, close doors and mark hole
Congratulations on assemblingyour 6x6 Maximizer Storage Shed!Note; Our Sheds are shipped as an unfinished product. If exposed to the elements, the we
Door Handle x2Exterior BarrelBoltSafety GlassesWork GlovesLadderScrew Gun/DrillTape MeasureHammerWood ClampLevelPliersTee Hinge x6Individual Hardware
A. Floor SectionPlywood Flooring(2)Floor JoistFrames(2)Floor Runners (3)Exploded view of all parts necessary to complete Floor Section. Identify all p
3. Lay out both completed Floor JoistFrames as illustrated at left. 2. When correctly positioned, attach each Joist with 4 - 2 1/2” screws (2 per en
Note: The floor will be flipped over and floorrunners will sit on your foundation. It is important to note that having a level foundation is critical
11. With Plywood positioned correctly on floor framing, attach using 16 - 1 1/4” screws persheet. B. Wall SectionExploded view of all parts necessary
13. Lay out all the wall panels and become familiarwith their location. Make sure to position panelsright side up so water is directed away from and n
Do Not Attach Walls ToFloor until Step 28.16. Position side wall intoplace on plywood floor.Butt both vertical wall studsof side and rear wallstogethe
Comments to this Manuals