Outdoor Living Today GGC63SR Installation Guide Page 5

  • Download
  • Add to my manuals
  • Print
  • Page
    / 20
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 4
Front
Gap at Front
5. With wall studs properly attached,
orientate completed walls around the
floor. Be sure to leave room to work.
Front Narrow Wall (2E) will be
required in this section.
Left Side Wall Panel
Wall Siding Flush
with Floor.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 5
Front
Back Wall Panels
Side Wall Panel
Front Narrow
Walls (2E)
Floor
Angled Left Side Wall
Side Wall Panel
6. Starting with angled left side wall, lift up and
position so framing is flush with floor at rear
of shed. Make sure wall siding is flush with
outside of floor on the side. In the front, there
will be a gap of approximately 5/8”. When
wall is positioned correctly, secure bottom wall
plate to floor with 4 - 2 1/2” Screws (C).
Rear
4 - 2 1/2” Screws
Bottom Wall Plate
Before
completely attaching
walls to floor (Steps 6-12),
check to make sure door
opening is 41” wide. See
Step 13 for illustration.
Page view 4
1 2 3 4 5 6 7 8 9 10 ... 19 20

Comments to this Manuals

No comments