6”
21. Place and attach (3B) Shingle (6” wide) directly on top of Shingle (3A). Shingle (3B) will slide
under 2nd row shingle. Secure with 2 - 7/8” Shingle Nails (M) 8” from butt.
6” Wide Shingle (3B)
Slide under
1/4” gap
Nail 8” from Butt
Nailing Line
Flush with (3A) Shingle
5” Shingle (3a)
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 10
19. Place Storage Shelf (2I) on top of supports and secure with 4 - 1 1/2” Finishing Nails (K).
Complete 2nd Shelf (if desired) as per Steps 18 & 19.
5”
20. Lay Roof Panel (3) on flat level ground. Note, overhanging Outside Shingles have been removed to avoid
shipping damage and need to be installed. Locate (3A , 3B & 3C) Shingles. There are 6 - 5” wide x 16” long
(3A) Shingles, 4 - 6” wide x 16” long (3B) Shingles and 2 - 6” wide x 12” long (3C) Shingles. Position and
attach (3A) Shingle (5” wide) on roof panel with 2 - 7/8” Shingle Nails (M). See above for details.
16” long
Roof Panel (3)
Outside Shingles
must be installed
Nail 4” from
front of shingle.
1/4” gap
Align Roof
Panel so thick
end of Shingle
(butt end) is
facing front.
See Step 25
for shingle
layout.
Front
Thin end
Thick end
Comments to this Manuals